हिन्दी Start Free

Solar Subsidy and Net Metering

Each installation keeps its net-metering and subsidy stage. Installations → Subsidy & Net Metering lists every job still waiting, with how many days it has been at its stage, so nothing sits with the DISCOM or the portal unnoticed. The invoice of an installation prints its size, DISCOM consumer number, inverter and panel serial numbers, the DCR declaration and the 70:30 note.

  1. On each installation, set the net-metering and subsidy stage as it moves (applied, inspected, approved, received).
  2. Open Installations → Subsidy & Net Metering; the longest-waiting jobs are at the top.
  3. Issue panels and the inverter to the site with their serial numbers once — the invoice prints them.

Open This in the App

More Help

All help articles