When you supply and install a solar power plant under one contract, GST law does not leave the split between goods and services to you: 70% of the value is taken as goods and 30% as service. From 22 September 2025 that comes to 8.9% of the contract value.

The rule

An explanation added by Notification 24/2018-Central Tax (Rate) says that when a solar power generating system or solar power based devices are supplied together with construction, engineering, installation or other technical services for setting them up, 70% of the gross consideration is deemed to be the value of the goods and the remaining 30% the value of the taxable service. The same explanation stays in the goods rate notification issued for 22 September 2025 (Notification 9/2025-Central Tax (Rate)).

The rates today

PartShareRateGST on ₹1,00,000
Goods70%5%₹3,500
Service30%18%₹5,400
Total100%8.9%₹8,900

Before 22 September 2025 the goods part was taxed at 12%, so the same contract carried 13.8%. The GST Council's 56th meeting cut renewable energy devices and their parts from 12% to 5%.

When it applies — and when it does not

  • A rooftop or ground-mounted plant supplied and installed under one contract — the usual EPC job.
  • Panels or an inverter sold on their own, with no installation, are a plain sale of goods at that item's own rate (5% for panels and inverters).
  • Batteries, cables and switchgear sold separately are taxed at their own rates (18% for most of them).
  • An AMC, panel cleaning or a repair visit after handover is a separate service at 18%.

How the bill should look

  • Two lines for the contract value: the goods part (70%) with its HSN — 8541 is the usual heading for photovoltaic modules — and the service part (30%) under a service heading such as 9954 (works contract), 9983 or 9987.
  • Work the split on the value before GST, so the two lines add up to the contract amount exactly.
  • Billing by milestone — advance, delivery, commissioning? Use the same 70:30 split on every milestone bill.
  • Money received in advance: GST is due on the service part of an advance, not on the goods part (advances for goods carry no GST under Notification 66/2017-Central Tax).

Contracts differ — a plant supplied by one company and installed by another, or a project split across several contracts, can be treated differently. Have your CA confirm how your contracts are billed.

In the app

Set the project to "Solar Plant (70:30 Deemed Split)" and every milestone invoice gets the two lines at the rates in force on its date, adding up to the milestone amount exactly; an advance taken on the project carries GST on its service part only.